Planning estimate · Q3 2026 pricing
Whole-home refresh
A whole-home refresh updates finishes throughout without moving structure. Select the items you plan to include to build a combined planning budget.
Loading calculator…
Hidden costs on whole home projects
These are included as allowances in the estimate above. Check that any contractor quote covers them too.
- Drywall repair and skim coating on older walls
- Trim and door adjustments after new flooring
- Electrical corrections found when replacing fixtures
- Painting preparation on unprimed or damaged surfaces
- Multiple disposal bins across phases
- Temporary accommodation or storage
Questions homeowners ask
- Is it cheaper to refresh everything at once?
- Usually yes. Doing paint, flooring, and trim in one mobilization avoids repeated setup, protection, and disposal costs, and reduces the risk of mismatched finishes.
- Should I refresh before selling?
- Paint, flooring, and lighting tend to be the lowest-cost updates that affect how a home shows. Compare the cost against the transaction costs in the Renovate vs. Move calculator.
Typical schedule: 4 to 10 weeks depending on how much is done at once. See the full renovation timeline.