Planning estimate · Q3 2026 pricing
Kitchen renovation
Kitchens combine cabinetry, counters, appliances, plumbing, and electrical work in one small space, which is why quotes vary so widely. Set the scope below to see a planning range.
Loading calculator…
Hidden costs on kitchen projects
These are included as allowances in the estimate above. Check that any contractor quote covers them too.
- Plumbing rough-ins and shut-off replacement
- Additional electrical circuits for appliances and lighting
- Appliance delivery and installation
- Disposal bins and haul-away
- Drywall repair, priming, and painting after demolition
- Design or drawing allowance when the layout changes
Questions homeowners ask
- Why do kitchen quotes vary so much?
- Cabinetry and counters can swing a kitchen budget by tens of thousands, and layout changes add plumbing, electrical, and drywall work that is easy to leave out of an early quote. Fixing the scope in writing is the fastest way to make quotes comparable.
- Does a kitchen renovation need a building permit?
- Cosmetic replacement often does not, but moving plumbing or electrical, removing walls, or altering structure usually does. Confirm with your municipal building department before work starts.
Typical schedule: 4 to 8 weeks on site once materials are ordered. See the full renovation timeline.