Planning estimate · Q3 2026 pricing
Bathroom renovation
Bathrooms are small but trade-heavy. Waterproofing, ventilation, and plumbing changes drive most of the cost difference between quotes.
Loading calculator…
Hidden costs on bathroom projects
These are included as allowances in the estimate above. Check that any contractor quote covers them too.
- Waterproofing membranes and niche detailing
- Exhaust ventilation ducted to the exterior
- Subfloor repair once tile is removed
- Plumbing valve and drain replacement
- Electrical upgrades for GFCI, heated floors, or fans
- Disposal bins and haul-away
Questions homeowners ask
- What makes a bathroom cost more than expected?
- Hidden conditions. Once tile and the tub come out, subfloor rot, failed waterproofing, and undersized venting are common. That is why a 15 percent contingency is the usual starting point.
- Is moving the toilet expensive?
- It can be. Relocating a toilet drain often means opening the floor and rerouting the drain and vent, which adds plumbing, structural, and finishing work.
Typical schedule: 2 to 4 weeks on site. See the full renovation timeline.