Roof replacement
Roofing is priced by area, material, and how difficult the roof is to work on. Existing layer count and hidden plywood damage are the usual surprises.
Loading calculator…
Hidden costs on roof projects
These are included as allowances in the estimate above. Check that any contractor quote covers them too.
- Plywood replacement discovered during tear-off
- Ice and water shield coverage requirements
- Chimney, vent, and wall flashing
- Attic ventilation corrections
- Multiple disposal bins for layered roofs
- Access equipment for steep or tall roofs
Questions homeowners ask
- Can I put new shingles over old ones?
- Sometimes, but an overlay hides sheathing problems, adds weight, and usually shortens the life of the new roof. Most quotes assume a full tear-off for good reason.
- Why do quotes include a plywood allowance?
- Damaged sheathing only becomes visible after tear-off. A per-sheet or per-square-foot allowance keeps that repair from becoming an open-ended change order.
Typical schedule: 1 to 4 days for a typical asphalt reroof. See the full renovation timeline.